Skip to main content
☰
KfW · Renovation

KfW 261 energy refurbishment loan: full retrofit and the distinction from KfW 262

The KfW 261 scheme offers a subsidised loan of up to €150,000 per residential unit for the complete renovation of a property to ‘Efficiency House’ standard and can be combined with the heritage building depreciation allowance. As of 21 July 2026, the scheme has undergone a fundamental change: there is a lower repayment subsidy, but the interest rate is lower.

Which amendments to KfW 261 for 2026 have been in force since 21 July 2026?

Under the Residential Building Loan 261 scheme, the repayment subsidy has been reduced since 21 July 2026, but the interest rate is lower as a result. The subsidy is tiered: 10 % for EH 40 EE, 5 % for EH 55 EE and EH listed buildings, whilst there is no subsidy for EH 85 EE and EH 70 EE.

Funding of up to €150,000 per residential unit is available; applications must be submitted via your main bank before work begins. You can find the original programme details on the KfW website at kfw.de/261.

How do you apply for KfW 261, and on what conditions?

The KfW 261 scheme provides funding of up to €150,000 per residential unit for the complete refurbishment of a property to ‘Efficiency House’ standard. The application must be submitted via the applicant’s bank before work on the refurbishment begins.

What does KfW 261 fund? The loan supports qualifying Efficiency House refurbishment with up to €150,000 per residential unit. Eligible standards include Efficiency House 85 EE or NH, with separate heritage standards for listed buildings. The building application or building notice must date back at least five years at application. An energy-efficiency expert confirms the current technical requirements, including renewable-energy conditions.

The higher the level achieved, the greater the repayment subsidy — on a sliding scale since 21 July 2026: EH 40 EE 10 %, EH 55 EE and EH listed buildings EE 5 %; for EH 85 EE and EH 70 EE, the subsidy does not apply. Only the low-interest loan remains. Funding from the federal and state governments.

When and where do you apply? Apply before refurbishment work begins. An application submitted after work has started will be rejected. Always apply through the bank providing the finance, never directly to KfW.

Which programmes can and cannot be combined with KfW 261?

You can combine the loan with many state funding schemes (IBB, SAB, NRW.BANK, L-Bank …) and the §7i depreciation allowance for listed buildings. It cannot be combined with individual BEG measures (BAFA or KfW 458) for the same project. In the free initial consultation, we coordinate application order and deadlines so that funding is not lost. Funding is available from both the federal and state governments.

What does the KfW 261 scheme fund — and what has changed as of 21 July 2026? KfW 261 provides funding for comprehensive energy-efficiency refurbishment to achieve ‘Efficiency House’ standard, in the form of a low-interest promotional loan per residential unit plus a repayment grant; since 21 July 2026, the repayment grant has been reduced, but the interest rate is lower.

The Efficiency House standard achieved determines the repayment grant: the better the standard, the higher the grant. Bonuses are available for worst-performing buildings and serial refurbishment. An energy efficiency expert confirms the standard achieved.

Since 21 July 2026, the scheme has shifted towards a lower repayment grant and a more favourable interest rate. These effects are not equivalent. A grant can reduce the equity contribution needed and is credited to the loan once its conditions are met.

If a planned grant disappears, more debt remains under otherwise comparable assumptions; a lower rate can offset part of the financing cost. Compare the full payment and debt schedule.

Include this shift in the debt service calculation for your refurbishment. Comparing nominal interest rates (Nominalzins) alone is not enough. We calculate the effects for you.

  • €150k loan per residential unit
  • EH 85 or a better eligible standard; heritage standards assessed separately
  • 5 years since the building application or building notice
  • Financing partner apply through the selected bank, not directly to KfW

Important: application order. A retrospective application means losing KfW funding. We coordinate the correct order of applications. Errors in this sequence are the most common and costly source of mistakes when financing investment properties.

What do investors need to know about KfW 261?

Eligible projects can be combined with suitable regional funding and, for listed buildings, Section 7i depreciation. The building application or notice must date back at least five years; an eligible Efficiency House 85 or better standard, or an eligible heritage standard, must be achieved.

The combination with state funding provides up to three funding components for a renovation project.

Energy requirements: the refurbishment must achieve an eligible Efficiency House 85 or better standard, or an eligible heritage standard. The building application or notice must date back at least five years at application. The repayment grant follows the approved standard and commitment terms, with the revised scale applying since 21 July 2026. Assess worst-performing-building and serial-refurbishment bonuses separately.

Particularly relevant for listed buildings: many listed building refurbishments meet the requirements for KfW 261. The combination of the listed building depreciation allowance under Section 7i + KfW 261 + a bank loan is one of the most tax-efficient models for investors. The application must be submitted before work begins.

Who can apply for KfW 261? Private individuals, businesses and owners’ associations for residential buildings in Germany. Applications are always submitted via the applicant’s own bank — never directly to KfW.

BEG transition as of 21 July 2026. On 8 July 2026, the Federal Government published the key points of the revised Federal Funding for Efficient Buildings (Bundesförderung für effiziente Gebäude, BEG); these have been in force since 21 July 2026.

Confirmed by KfW itself: the repayment grants have been reduced by a flat rate of 10 percentage points; the renewable energy class is now standard (the previous 5-point bonus no longer applies), the maximum funding amount is a uniform €150,000 per residential unit; in return, the interest rate is reduced more significantly.

The EE class is now compulsory. The new repayment subsidy scale for each level: EH 40 EE 10 %, EH 55 EE and EH listed building EE 5 % — for EH 85 EE and EH 70 EE, the repayment subsidy does not apply (the low-interest loan remains in place).

On top of that: +5 points for the NH class, +10 points for a ‘worst-performing building’ (EH 70/55/40 EE/NH), a serial refurbishment bonus of 15 points for EH 55/40 EE/NH or 5 points for EH 70 EE/NH (from September 2026).

Another new development is that comprehensive refurbishment (KfW 261 / BEG WG) and individual measures (BAFA / KfW 458) can no longer be combined for the same project — it is either one or the other.

The rate specified in your KfW approval is decisive; applications that have already been approved are not affected. Source: BEG Funding Guidelines for Residential Buildings (BEG WG) and Individual Measures (BEG EM), BMWE, valid from 21 July 2026, published on 20 July 2026 on energiewechsel.de; KfW overview page ‘Adjustments 2026’; KfW press release dated 8 July 2026. Checked on 21 September 2026.

KfW Repayment Calculator 261: How does the remaining debt change without a repayment subsidy?

If the capital repayment subsidy is withdrawn, the outstanding debt at the end of the fixed-interest period will be higher.

A repayment grant can reduce the equity needed and is credited to the loan after its conditions are met. A lower interest rate reduces financing costs, with the effect on instalments and debt depending on the repayment structure. Include both effects in the debt-service calculation rather than comparing nominal rates alone.

KfW 261: What is eligible for funding under the ‘Efficiency House’ scheme for comprehensive refurbishment?

Funding is available for the complete refurbishment of a property to ‘Efficiency House’ standard, in the form of a subsidised loan of up to €150,000 per residential unit.

The project must achieve an eligible Efficiency House standard, such as 85 EE or NH, or an eligible heritage standard. The building application or notice must date back at least five years. Since 21 July 2026, the EE base grant is 10 % for EH 40 EE and 5 % for EH 55 EE and EH Denkmal EE; EH 85 EE and EH 70 EE have no base repayment grant. Assess other classes and bonuses separately.

KfW 261 · Renovation · Detached house

Detached house in Münster — Complete refurbishment

PositionAmount
Purchase price€280,000
Refurbishment costs€65,000
KfW 261€65,000 / ~KfW terms on the date of approval
Bank loan for purchase€240,000
Energy class before/afterH → C
Total instalment~€1,700
Savings on heating costs~€2,400 per year

Conditional illustration, without guarantee. Purchase and refurbishment total €345,000; the loans shown total €305,000. The remaining €40,000 must be covered by equity or other finance, with acquisition costs added.

The H-to-C energy rating alone does not establish an Efficiency House standard. This example assumes expert confirmation of an eligible overall project and the relevant KfW commitment.

Work out this calculation using your figures →

KfW 261 · Multi-occupancy flat, built in 1972 · Cologne

Flat in Cologne — Windows & Heating

PositionAmount
Property value€240,000
Renovation worksWindows + heat pump
Costs€32,000
KfW 261€32,000 / ~KfW terms and conditions on the date of approval
KfW instalment~€230 per month (10 years)
Energy rating before/afterG → E

Conditional illustration, without guarantee. It assumes an eligible overall refurbishment to a qualifying Efficiency House standard and the corresponding KfW commitment. Windows, a heat pump and the G-to-E energy rating do not establish eligibility by themselves; an energy-efficiency expert must confirm the overall project.

The instalment shown is not a complete repayment schedule: check the interest, grant, term and remaining debt against the actual commitment.

Work out this calculation using your figures →

Frequently asked questions

When must the KfW 261 application be submitted?

Apply before refurbishment work begins. An application submitted after this point will be rejected. We coordinate application order so that KfW funding and bank financing are aligned.

Can I combine KfW 261 with regional funding?

Yes — KfW 261 can be combined with many regional funding schemes (IBB Berlin, SAB Saxony, NRW.BANK, etc.). The exact combination depends on the property and the work to be carried out.

How much is the capital repayment subsidy under the KfW 261 scheme?

That depends on the efficiency-house level you reach after the refurbishment. Since 21 July 2026 the following applies (the EE class is mandatory): EH 40 EE 10 %, EH 55 EE and EH Denkmal EE 5 % — for EH 85 EE and EH 70 EE the repayment grant no longer applies, the reduced-interest loan remains.

On top come +5 points for the NH class, +10 points for a “worst performing building” and the serial refurbishment bonus (15 points EH 55/40 EE, 5 points EH 70 EE from September 2026).

What counts is the rate in your KfW commitment, not the one in a table. What we do for you: check the commitment against your calculation before you sign.

Can I combine KfW 261 with individual BAFA measures?

Since 21 July 2026, the BEG individual measures (BAFA or KfW 458) and the comprehensive refurbishment scheme under KfW 261 (BEG WG) can no longer be combined for the same project — it is either one or the other. Anyone who applies for funding for their heating system as an individual measure today cannot also use the 261 comprehensive loan for the same renovation, and vice versa.

The choice and sequence of measures is therefore a financing decision — and this is precisely what we will work through with you before the first application is submitted.

Why might the cut be more expensive for me than a rise in interest rates?

A repayment grant can reduce the equity contribution needed and is credited to the loan when its conditions are met. Losing a planned grant leaves more debt under otherwise comparable assumptions. A lower rate can reduce financing costs and offset part of the difference. We compare the full payment and repayment schedules rather than the nominal rate alone.

Has KfW 261 been suspended, and what is its current status?

The KfW 261 scheme was temporarily suspended in July 2026, with amended terms and conditions; new terms have been in force since 21 July 2026. The scheme is still running; please check the status on kfw.de before submitting an application.

KfW 261 eligible costs: What counts towards them?

Eligible costs include the recognised work needed to reach the approved Efficiency House standard. The refurbishment loan can cover up to €150,000 per residential unit. Specialist planning, on-site supervision and any sustainability certification can have separate additional funding limits; assess them separately in the financing plan.

KfW 262 and KfW BEG funding: What is the difference?

KfW 262 was the loan variant for individual BEG measures, not a grant. KfW lists the former grant variant as programme 461. Both were discontinued on 27 July 2022. Loan 261 now supports qualifying refurbishment to Efficiency House standard. BEG is the wider federal funding framework with different programmes, each with its own conditions. Source: KfW product archive.

Request a financing analysis

Free, no-obligation initial consultation — the commission is usually paid by the bank. We review 650+ banks, plus all regional funding schemes (Landesförderung), to find the best fit for your situation.
This does not constitute legal or tax advice.

For a property loan, most banks only arrive at a workable calculation from a household net income of around €3,500 a month — for couples, the joint income counts.

Bring the renovation plan, estimated costs and expected energy standard. We can assess how a KfW component could fit with the rest of the mortgage and the required deposit.

Related pages

KfW

KfW 458 — Heating subsidies (Heizungsförderung) (in German)

Replacing the heating system as a stand-alone measure — an alternative to a full refurbishment.

Self-test · 1 min.

KfW Funding Check

Which of the eight KfW programmes is generally best suited to your project?

Calculator

KfW Repayment Calculator

Calculate the instalment, remaining debt and effect of the capital repayment subsidy for KfW 261.

Specialisation

Funding for monuments (in German)

Section 34i, KfW Kombi, completion value.

Federal state

NRW.BANK (in German)

Cologne, Düsseldorf, the Ruhr region.

Self-test · 1 min.

Checklist for individual measures

Windows, façade, roof, heating — which of these four measures is still outstanding for your property?